Project
The Anthesis team responded to Resource London’s ITT and presented how we would develop the toolkit in line with their requirements. Once commissioned, we presented the concept of the toolkit to a working group set up by Resource London (The working group consisted of representatives from Resource London, the London Boroughs, WRAP, LARAC, LEDNET and ESA) to guide the development of the toolkit, and led a facilitated workshop to further understand what features the toolkit should include. From this, a specification was developed, in conjunction with the group, which informed the creation of the toolkit.
Once the first draft of the toolkit was produced, a number of London boroughs tested the tool for usability and relevance to their local circumstances. Following this stage, a second workshop took place that allowed the testers to provide feedback that was incorporated into the final toolkit.