Situation
Jones Lang LaSalle (JLL) aimed to support a bank to achieve net zero in its operations by 2030, as part of a continued commitment to sustainability.
Impact
- £1,813,000 energy savings over the next ten years.
- Energy-saving additive payback of 1.6 years.
- 8,330,000 kgCO2e saved during the next ten years.
Solutions
Situation
Jones Lang LaSalle (JLL), a global real estate company, delivered a multi-year energy performance contract for a global bank. As part of a continued commitment to sustainability, the real estate company has aimed to support the bank to achieve net zero in its operations by 2030.
The goal of the bank’s energy-saving project was split into two parts:
- Monitoring and Verification study to prove the savings of installing an energy-saving additive into the heating system.
- Rollout of heating optimisation technology into every branch and bank occupied buildings heating system across the UK.
Solution
Anthesis was commissioned by JLL to provide independent verification of the potential of an energy-saving additive and its ability to improve the efficiency of condensing boilers across its sites.
The energy-saving additive works by allowing better transfer of heat within boilers and emitted through radiators, leading to lower gas consumption and a reduction in the cost of heating the building.
To assess the effectiveness of the energy-saving additive, Anthesis conducted a monitoring and verification study, comprising of installing the energy-saving additive across a sample of sites across the UK and measuring the reduction in gas used over similar external temperature periods.
Anthesis then managed the installation of the energy-saving additive across every branch-occupied building in the UK. The results were independently tested by a laboratory to ensure optimum efficiency was achieved.
The study highlighted that the energy-saving additive would provide an average gas saving of 13%, as well as quicker cycling times for the boiler.
Anthesis successfully managed the national rollout of the heating optimisation technology across approximately 400 suitable branches and bank occupied buildings across the UK.
Impacts
- £1,813,000 energy savings will be achieved across the next ten years.
- Energy-saving additive payback of 1.6 years.
- 8,330,000 kgCO2e saved during the next ten years.